Green Energy

March 2025

The DESign Group is continuing it's initiative of going green. In additional to our 250kWp Grid tied system that included 220Kw inverter/s as well as 450 x 545 Watt solar panels on the roof of Plant 1 in February 2024. We are excited about additional solar installation at Plant 3 consisting of a 50kW inverter system paired with a 84 x 600W solar panels.

Marking another major milestone in our sustainability journey!